Skip to content
Welcome to the Malaysian Iron and Steel Industry Federation
MISIF Logo

Malaysian Iron and Steel Industry Federation

The National Industry Association for Manufacturers of Iron and Steel Products

  • About Us
    Malaysian Iron and Steel Industry Federation
  • What We Do
    Corporate, Business, and Government Engagements
    • MISIF’s Mission
    • Committees
    • Membership
    • Eligibility Criteria
  • Contact Us
    Get in Touch with Our Secretariat
    • Advertise With Us
  • Home
  • News
  • Events
  • Publications
    • Flagships
    • Newsletter
  • Media & Resource Centre
  • Directory
    • All Members
    • Affiliate Members
    • Semi Finished: Billets/Slabs
    • Rolled Products: Long (Bar/Section/Wire Rod)
    • Scaffolding
    • Rolled Products: Flat Products (HRC/CRC/Plate)
    • Secondary Steel Sheet Products
    • Engineering & Fabricated Products
    • Wire & Wire Products
    • Pipes, Tubes, & Fittings
    • Iron & Steel Casting & Diecasting
  • CLA
  • Member’s Access
  • News Page

C12-2025 Federal Government Gazette P.U. (B) 213 Notice Of Extension Of Time Period For Making Preliminary Determination

norlian78 by norlian784 June 202510 June 2025

Dear Members,

We enclose the following document for your kind attention:

  1. Federal Government Gazette P.U. (B) 213, Notice Of Extension Of Time Period For Making Preliminary Determination

Thank you.

DOWNLOAD CIRCULAR HERE

DOWNLOAD DOCUMENTS HERE

(Member) Member's Circulars, Uncategorized

Post navigation

Previous Entry REGISTRATION CLOSED: Workshop on Managing Poor Performance & Disciplinary Issues
Next Entry C13-2025 Federal Government Gazette P.U (A) 170 & P.U. (A) 171

Quick Links

  • News
  • Events
  • Insights
  • Publications
  • Media & Resource Centre
  • Directory

Shortcodes Ultimate

Shortcodes Ultimate

Shortcodes Ultimate

Shortcodes Ultimate

Advertise with us and showcase your business or services to top-flight business owners.
Click to learn more
2026 Malaysian Iron and Steel Industry Federation